Start with the scheme you have
You can begin a Building for a Healthy Life self-assessment while your scheme is still developing. You do not need a polished submission bundle before opening an account and starting a draft.
What you do need is a clear view of the scheme you are assessing: its boundary, design stage and current drawings. As you work through the questions, the useful test is whether another person could understand the basis for each answer.
In BHL Assessments, drafting and the full indicative preview are free. You can work through the twelve considerations, attach relevant evidence and see what remains outstanding before deciding to finalise. Start a free assessment or download the first-assessment checklist.
Three different things evidence needs to do
Evidence should help a reader locate the scheme, understand the proposal and follow your judgement. A drawing may do one of those jobs well without doing the others.
An OS location plan identifies the site's extent. A layout may show where a route is proposed. A comment explains why that route supports your answer, including any unresolved connection beyond the boundary. Simply attaching the layout does not explain that last step.
The official Building for a Healthy Life 2026 edition is the reference for the framework. The evidence suggestions below are practical ways to explain a scheme; they are not a universal document list set by the framework.
Which documents are useful?
Use material that addresses the point in question and is appropriate to the scheme's stage. These are examples, rather than documents every project must produce.
Connections and everyday journeys
A context plan, movement plan, route diagram or relevant transport information can help explain how people would reach nearby destinations. Identify the actual route and any barrier, crossing or off-site link that affects it. A straight-line distance alone does not describe the journey someone would make.
Layout, streets and buildings
A layout, street section, frontage study or parking arrangement can help a reader understand how buildings and streets relate. Reference the part of the drawing that supports the answer. Where detail is reserved for a later stage, say what is fixed now and what remains unresolved.
Landscape, water and shared spaces
Landscape drawings, drainage proposals, open-space information or a management approach may be relevant. Distinguish what a drawing proposes from what is established about its delivery and future care. A green area on a plan cannot, on its own, explain all those matters.
Local context and design choices
Site photographs, a context study or a relevant design statement can explain existing conditions and the choices made in response. Use a specific view or section reference. A large document labelled only "design statement" leaves the reader to find the argument for themselves.
Start with relevant material your team already has. If an answer exposes a genuine information gap, record it and decide how to address it. Uploading more files will not resolve an uncertainty about the design.
Write comments that connect the evidence to the answer
A useful comment combines four things: the document and revision; the feature or location; what it shows; and any limitation that affects the judgement.
For example, this fictional demonstration note makes the unresolved issue visible:
Movement plan MP-03, revision C, shows the proposed pedestrian connection at the eastern boundary. The layout allows for that connection; its delivery across adjoining land remains to be agreed.
This is an example of a clear explanation, not a model answer or a suggested rating. The person assessing the scheme must decide which answer the available information supports.
Keep dates and revisions consistent. If an answer relies on a newer layout than the one uploaded, update the reference or evidence so the record tells one coherent story. Where the same document supports several answers, identify the relevant page, drawing or feature in each comment.
How evidence works in BHL Assessments
The tool presents questions in BHL Assessments' own words under the framework's twelve considerations. Your team supplies the answers and reasoning; BHL Assessments' published rating rule converts the answers into the indicative result.
Upload supporting documents against the considerations they relate to. The upload gives the reader the source material; the comment tells them what to look for and why it matters.
The current tool requires a comment for a Somewhat answer, a Yes answer to a point about what to avoid, and a Not applicable answer. Not applicable needs a reason why the point cannot bear on the scheme. It is not a substitute for information you do not yet have. If every point about what good looks like in a consideration is marked Not applicable, that consideration cannot be rated and the assessment cannot be finalised.
You can open the full indicative preview while the draft is incomplete. Read it alongside the outstanding-items list and use it to identify the next useful piece of work. See how the assessment works.
What must be ready before finalisation?
Starting a draft and finalising a record are different stages. Before you finalise, the current tool checks that:
- Every point has an answer, every required comment is present and all twelve considerations can be rated.
- An OS location plan has been uploaded and marked as the location plan, and the required upload checks are satisfied.
- The scheme has a what3words address. This identifies a point; the location plan identifies the site's extent.
You then review the assessment, give the declarant's name and role, make the declaration and complete the finalisation confirmation. Payment or an available assessment entitlement is needed to finalise. The tool shows the outstanding items for your assessment, so use that current list as your final check.
This is a software readiness check. It does not establish that a particular drawing, answer or scheme is correct. The assessment remains your team's self-assessment, not an independent design review or a planning decision.
See the record before you pay
The paid output is a recorded, locked self-assessment with a Certificate and full Project Pack. View the fictional example output to see how the result, answers, comments and supporting material are presented. It is an illustration of the output, not a customer case study or a target score.
For a single scheme, pay-as-you-go finalisation is £450 + VAT (£540 including VAT). Drafting and the full indicative preview are free. Check current pricing before purchasing.
Choose a live scheme, gather its current drawings and start your free account. Work through the questions at your own pace, use the preview to understand where you stand, and finalise when the record is ready to share.